Risk assessment-pre production

A risk assessment is made to ensure the saftey and well-being of everyone invovled in the making of the film.

The sheet in which I did the work on was hard to read so thats way it is in this format.

The risks that were involved in my short film were:

Moving vehicles. This was when we were in the shots with Oldman and Karl as well as David and Gary. The way I worked around this is I only filmed when there were no vehicles in the section of the building when I was filming.

Shooting in a dark location. This is for the 'kitchen' scene. The way I worked around this is that I made the cast that were needed for this scene knew ecactly what they were doing and the area in which it was taking place as to avoid any obsticles around them.

Comments

Popular posts from this blog

The Importance Of Sound Editing

Radio Drama Pre-Production Log

Castlist